PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing the shear wall panels at Stair -4 (3rd Floor) Facing South-East (800x600).jpg Tying the reabr masts at Elev. 4-Stair -2 (4th Floor)  Facing South (800x600).jpg Underground storm piping Facing North-East(800x600).jpg Underground storm piping Facing West (800x600).jpg Compacting the underground piping at Rahway Ave. Facing the Administration Building (800x600).jpg Excavating at Rahway Ave. across the New Building (800x600).jpg Excavation for the underground Tele-Data Facing the New Court House (800x600).jpg Grouting steel plates Pic -3 (800x600).jpg Grouting steel plates Pic -4 (800x600).jpg
Previous pageNext page Compacting the underground piping at Rahway Ave. Facing the Administration Building (800x600)
Compacting the underground piping at Rahway Ave. Facing the Administration Building (800x600)